Welded Steel Pipe for Building Materials

Welded steel pipe for building materials Inspection With Hydraulic Testing, Eddy Current , Infrared or X-Ray Test Also With Chemical And Physical Property Inspect

Send InquiryChat Now
Product Details

Welded steel pipe for building materials


Package

1. Bundle packing. 

2. Bevelled end or plain end or varnished as per buyer's  requestments. 

3. Marking: as per customer's requests. 

4. Painting varnish coating on the pipe. 

5. Plastic caps at ends.


Inspection

With Hydraulic Testing, Eddy Current , Infrared or X-Ray Test 

Also With Chemical And Physical Property Inspect


Usage

Petroleum, power, gas, chemical and medical equipment, construction, bridge, power engineering




 

Application

image006.jpg


FAQ

1, what is your time of making a sample

Usually we will take 1~3 days to make the sample

2,What is your delivery time?

For stocks, we can send the goods to loading port within 7 days after receiving your deposit

For production period, it usually needs about 15days- 30 days after receiving the deposit 

3, What is your shipping port?

Shanghai port, Ningbo port, Tianjin Port

4, What is your payment terms?

Usually 30% deposit by TT in advance and balance against copy of BL or LC at sight 



Hot Tags: welded steel pipe for building materials, China, suppliers, manufacturers, factory, wholesale
Related Products
Inquiry

Remark:

.

SUBMIT

.